1. Construction of an office building with shops, underground garages, a café, a power substation and a fence on Stamboliysky Blvd., Sofia.
Developed built up area of 10 000 sq. m.
Construction period of structural works: 21 May 2010 – 13 April 2011
2. Facade and roof works of office building with shops, underground garages, a café, a power substation and a fence on Stamboliysky Blvd., Sofia.
Execution period : 15 February 2011 – 15 October 2011