Public

Public (139)

Office Building on Todor Aleksandrov Blvd. Sofia

Developed built up аrea of 10 300 sq. m.

 Construction period: 21 May 2010 – 31 December 2011

Finishing off construction works of a new Orthodox Church in Smolyan

Тotal area: 2 100 sq.m

Construction terms: August 2004-July 2006

Orthodox Church Saint George the Conqueror in White Church Residential Complex

 Opening - 03 May 2009

Rough construction of Orthodox Church "St. Patriarch Evtimiy" at University of St. St. Kirill and Methody, Veliko Tarnovo

 

 

Reconstruction of Trade centre “Sumi” in the town of Vratsa

Total area: 4500 sq.m.

 Construction terms: June 2005-November 2005

 

Building up a new Orthodox Church in Elin Pelin

 Construction terms: May 2005 - May 2005

Reconstruction and strengthening of an office building in campus

Developed build up area of 16 400 sq. m

Construction terms: 11.02.2015 - 30.07.2015

1. Construction of an office building with shops, underground garages, a café, a power substation and a fence on Stamboliysky Blvd., Sofia.

Developed built up area of 10 000 sq. m.

Construction period of structural works: 21 May 2010 – 13 April 2011

2. Facade and roof works of office building with shops, underground garages, a café, a power substation and a fence on Stamboliysky Blvd., Sofia.

 Execution period : 15 February 2011 – 15 October 2011

Renovation of the SPA hotel for “Royal holidays” in Devin, including building of a new wing with swimming pool and health centre

Total area: 7200 sq.m

Construction terms:February 2004-June 2004

Multifunctional Building – apartments, hostel, offices, shops, café, dental clinic, underground parking and power substation, located in Slatina District, Sofia.

Developed built up area of 7 142 sq. m

Construction period: 10 August 2011 - 3 December 2012